JSC «PEC UralTEP»

About the Company

Joint Stock Company "Project-engineering center UralTEP" was founded in 2003. The core personnel was formed by designers from Uralteploelektroproekt institute which participated in creation of the largest power plants of the country.

PEC UralTEP specializes in complex design of power plants and power grids. Specialists work in the Ural, North-West, Volga, North Caucasus and Siberian federal districts, as well as abroad. Customers include heat generating companies of the wholesale market, territorial generating companies, OJSC "Federal Grid Company", companies of OJSC "IDGC", industrial, oil and gas producing enterprises.

PEC UralTEP was one of the first in Russia who proposed a solution for oil gas utilization during design of 24 MW gas turbine power plant at Igolsko-Talovoe oil field in Tomsk region. The company is also the author of the Noyabrsk CCPP project, one of the most technically advanced plants of its kind in Russia.

The Company's quality management system is certified by GOST R ISO 9001-2015 (ISO 9001:2015). At present, more than 100 people work in PEC UralTEP. The average age of employees is 40 years.

General Director

Sergey Sosnovskikh

Graduated with honors from the Ural State Technical University in 2003 (Thermal power plants). Started career in power industry in 2003, working at PEC UralTEP since 2004. Served as chief project engineer for major generation facilities including Noyabrsk CCPP, Pervomayskaya CHP-14, and Chelyabinsk CHP-1.

Completed international internship in Germany (BMWi program, 2016) and the Presidential program for management training (2017). Appointed General Director of JSC "PEC UralTEP" in January 2019. Member of the Energy Committee of the Sverdlovsk Regional Union of Industrialists and Entrepreneurs since 2021.

Services
Our Services
Power Plant DesignIntegrated design for green-field construction, reconstruction and modernization of thermal power plants based on steam boilers, combined cycle, gas turbines, small CHP, boilers, chemical water treatment plants, fuel supply, heating networks.
Power Grid DesignIntegrated design for green-field construction, reconstruction and modernization of substations (6-500 kV), overhead and cable power lines, dispatch control systems, fiber optic networks, relay lines.
Engineering ConsultingInvestment justification, feasibility studies, design documentation expertise, consulting on main and auxiliary equipment selection.
Designer SupervisionDesigner supervision services for all designed sites, including technical support during construction and commissioning.
3D Laser ScanningPrecision facility scanning since 2013 using own trained team. First project — Permskaya GRES. Results used for accurate digital models of existing facilities.
3D Design TechnologiesModern 3D design based on Model Studio CS (domestic software since 2022, previously AVEVA PDMS). Project management via Primavera, electronic document management via TDMS.
Projects
Key Projects
2003–2004Design for 24 MW Gas Turbine Plant at Igolsko-Talovoe oil field, Tomsk region
2004–2008Revamp of Seversk CHP at Siberian Chemical Plant (Washington Group International medal)
2005–2007Revamp of regional heating plant Strogino, Moscow (2×PGU-130)
2006–2008Design for Noyabrskaya CCPP, Tyumen region (2×PGU-62 MW)
2007–2010Revamp of Pervomayskaya CHP-14, St. Petersburg (3×PGU-180)
2006–2008Design for 500/220/110 kV substation Novo-Anzherskaya, Kemerovo region
2016–2018External power supply for RN-Uvatneftegaz (7 substations 110-220 kV)
2020Gas processing complex design for NIPIGAZ